Part 2 — Surveys of Public Land and Metis Patented Land in Unsurveyed Territory
33 Official plan
plan of Metis patented land surveyed pursuant to section 32
(a) shall be plotted from the surveyor's field notes under the
direction of the Director, and
(b) shall show the directions and lengths of the boundaries, t he
nature and positions of the monuments and the areas of the
parcels laid out.
(2) The confirmation of a plan referred to in subsection (1) by the
Director shall be held to be a confirmation of the survey and the
confirmed plan is the official plan.
(3) No land is considered to be surveyed until the official plan has
been confirmed by the Director.
(4) If the official plan is found to have been improperly or
incorrectly plotted from the field notes of the survey, or if any
omission or clerical error or other defect is found on the plan, the
Director may cause a new plan to be made showing the omission,
error or defect corrected and the new plan shall, after it has been
RSA 2000
confirmed by the Director, become the official plan and shall be
used for all purposes instead of the old plan.
(5) The Director shall, forthwith after the confirmation under
subsections (2) and (4), file one copy of the official plan with the
Registrar.
1987 cS-29.1 s30;1996 c32 s5(48);1998 c22 s43